Overview

Chicago data center, located just 15 miles from downtown Chicago, offers Disaster Recovery as a Service(DRaaS), cloud services, managed services and more while delivering the highest level of security, safety, redundancy, reliability, scalability, and technology. Our Chicago West Data Center is audited under The space is located in a secure facility audited under ITAR, EU-US Privacy, SOC 1, SOC2, HIPAA, GLBA, and PCI Colo standards annually to help meet your compliance requirements.

  • 15,650 sq.ft of raised floor
  • IOG Inter-Facility bandwidth
  • Security profile includes multi-factor authentication requirements for data center access, mantraps and video surveillance
  • 2N or system plus system power design
  • 2,500kVA of initial distribution capacity with each customer cabinet served with redundant A-/B-side power feeds
  • Two (2) 2,000kW Cummings backup generators each with 4,000 gallons of fuel storage
  • Carrier neutral, resilient IOG Internet connectivity with high availability
  • All infrastructure concurrently maintainable
  • 89,000 sq.ft. purpose-built data center facility
  • 15,650 sq.ft. of raised floor data center space
  • Masonry and steel construction
  • All infrastructure components concurrently maintainable
  • 24-hour physical security monitors cameras, door position and badge access areas
  • Video surveillance and capture to DVR
  • Pan-tilt-zooms (PTZs) cameras at each doorway throughout the exterior of the facility
  • Multi-factor authentication including biometric scanning required for entry into data center and critical areas
  • Security mantrap
  • 2N or system plus system power design
  • 2500kVA of initial distribution capacity with each customer cabinet served with redundant A-/B-side power feeds
  • Two (2) 2,000kW Cummings backup generators each with 4,000 gallons of fuel storage
  • Generators tested weekly at no load and monthly at full load
  • Multiple MGE 8,000 625kVA arrays for true 2N redundancy within the electrical system
  • 1,550kW of uninterrupted power supply (UPS) critical load capacity
  • Minimum of 24 hours of on-site fuel storage
  • Carrier-neutral, resilient IOG Internet connectivity with high availability
  • Diverse upstream feeds via nseparate paths into facility
  • TierPoint provided, redundant IP network connectivity utilizing HSRP and other protocols
  • TierPoint provided cross connects of standard media types to connect to your carrier of choice
  • AT&T
  • Comcast
  • Level 3
  • TeliaSonera
  • Zayo